Archives

All posts by jimmylwright

Download PDF

Everything you see is for sale. The fuselage is about 90 percent complete. There are a few brackets and the landing gear that still needs to be fabricated.

The ribs are done and the spars are done except for a couple of doublers. Everything was glued using T88 epoxy.

Most all of the wood items have been purchased and included.

I am a tool and die maker and have built an RV9A in the past. I have been welding with tig and stick welding most of my adult life.

The fuselage was gas welded using proper filler rod for this application.

$2,000 firm for everything.

Download PDF

I tack welded the landing gear up but not sure if I will use this version or make a new one that has the springs. I plan on using big soft lawn mower tires to take up the shock.

20141122_153840